Plant Deck Installation for New AHUs
Project Case Study: Plant Deck Installation for New AHUs
Client: Confidential
Location: Lakeside Shopping Outlet
Duration: 6 Weeks
Sector: Commercial / Retail
Scope: Structural Steelwork, Flooring & Handrail Installation
Project Overview
Multifab Metals Engineering Ltd successfully completed the installation of a new plant deck structure to support air handling units (AHUs) at a busy shopping outlet. The project required precise planning, efficient delivery, and careful coordination to ensure minimal disruption to the public and surrounding retail operations.
Our Scope of Works
Over a six-week programme, Multifab was responsible for the full supply and installation of the new plant deck, including:
-
46+ tonnes of structural steelwork
-
290m² of open mesh flooring
-
200+ metres of handrailing
The works were carried out predominantly overnight, allowing the shopping outlet to remain fully operational throughout the project.
Challenges & Solutions
Operating within a live retail environment required stringent health and safety management, logistical coordination, and noise control measures. By adopting flexible working hours and close collaboration with the client’s project team, Multifab ensured that all works were completed safely, efficiently, and to programme.
Results
-
Project delivered on time and within budget
-
Zero disruption to public access and trading
-
High-quality installation meeting all structural and safety standards
Conclusion
This project demonstrates Multifab Metals Engineering Ltd’s ability to deliver complex structural steel solutions in sensitive, high-traffic environments. Our proactive approach to planning and execution ensured a smooth delivery and another successful outcome for a valued client.